Ducting Service in Dubai

[SLGF id=1308]

Ac duct fabrication service Dubai

Dream Cool Air Condition Systems specialized in all kind of ducting fabrication services in dubai supply, installation, fabrication and maintenance at any scale of premises. Whether it be residential luxury villas or commercial buildings, warehouses, hotels, schools or office towers. We are specialize in ac duct fabrication in Dubai and ac duct repairing in Dubai along with ac duct maintenance in Dubai.

Our skilled and experienced professionals are well equipment & trained. We deliver the project within contractual time frame. Our ac duct fabrication workshop is having all the required equipment to fabricate ducting according to your needs.We do provide services for latest ducting systems of Pre-insulated (PI) according to your need.

G I Ducting:

It is made by galvanized sheet and wrapped by glass wool and canvas cloth and to bound them glue and forster is used. It is old and still using method. It costs higher then other Pre insulated ducting & it also takes more time to fabricate and install. It is too much heavy too.

P I Ducting:

P I ducting is made by pre insulated sheet. Which is like a sandwich sheet. It is having aluminum sheets from outer side and inside it has insulation to stop heat transfer. It looks nice that is why some persons don’t even make ceiling to hide it. This is the modern type of ducts which are normally being used now a days. You can find ducting service in dubai at its best from us. So don’t wait and call us now.

Dream Cool air condition systems ( L.L.C.) owns a variety of Machinery & tools to cater for the various scope of activities manipulated such as:

Duct Fabrication Machines:

a) Lock Former

b) Cutting Machine

c) Bending Machines

d) Rolling Machines

e) Threading Machine

 f) Grooving Machine

2 – Duct Installation Tools

3 – Duct Fabrication Tools

 4 – Welding Machine

5 – Welding Tools

6 – Pressure Testing Machine

7 – Electrical Drill including Hole Saw Cutter

8 – Workshop for duct fabrication & preparation

Feedback

Leave a Reply